When Standby gets Server, Message Control active status is reset to the default project setting

When Standby gets Server, Message Control active status is reset to the default project setting

Summary

When Standby gets Server, Message Control active status is reset to the default project setting instead of the currently used Message Control mode.

Description

When Standby gets Server, Message Control active status is reset to the default project setting instead of the currently used Message Control mode.

Solution

Message Control redundant operation was modified so the current state also is taken over when a redundancy switch occurs.

Information




Issue Number: 31059
Fixed on Date: 18.12.2013
Versions: 7.20 0 BUILD 17768