It can occur that in the Production & Facility Scheduler screen the Time model group and Schedule criteria are not reflected in the Calendar although these are correctly filtered in the tree view.
It can occur that in the Production & Facility Scheduler screen the Time model group and Schedule criteria are not reflected in the Calendar although these are correctly filtered in the tree view.
An issue has been address so that the filter of the Production & Facility Scheduler screen works correctly in the runtime.