When creating a new time in the Production & Facility Scheduler in the editor or runtime, the new absolute time point cannot be created if the same set time was used before when configuring a relative point of time.
When creating a new time in the Production & Facility Scheduler in the editor or runtime, the new absolute time point cannot be created if the same set time was used before when configuring a relative point of time.
An issue has been resolved so that the new time can be created in the editor and runtime.