After reopening the Scheduler/Production and Facility Scheduler properties in the editor, the previously designated country to define the holidays is incorrectly selected and loaded in the calendar.
After reopening the Scheduler/Production and Facility Scheduler properties in the editor, the previously designated country to define the holidays is incorrectly selected and loaded in the calendar.
An issue has been addressed so that the configured country is selected and loaded in the Scheduler/Production and Facility Scheduler calendar.