If a switching point is set to inactive in the scheduler, it is still active and the settings look like before.
If a switching point is set to inactive in the scheduler, it is still active and the settings look like before.
An issue was addressed in the scheduler where changes to the active state of a switching point was not saved. Now, changes are applied correctly to the switching point.
Fixed on 23.04.2012, available from 7.00 SP0 Build 1