Description
The stratonNG driver lost the status information of variables which were not BEV buffered after a network breakdown between the Server and the IoT (Logic Server).
The issue has been addressed and the status information is now transmitted as expected.
To benefit from this fix:
- Update your zenon Software Platform to the latest build of zenon 15 or higher.
Item ID: 303730
Version: 15.00 Build: 461952