Scheduler: After converting from 6.51 to 14, changes to entries are not saved if switch point has no ending time
Description 
 
The scheduler did not save the changes to the entries after converting from zenon version 6.51 to zenon version 14 if the switching point did not have an end time. The issue has been addressed and saving changes after converting the zenon version now works as expected.  
 To benefit from this fix:  
  
- Update your zenon Software Platform to the latest build of zenon 14 or higher.  
 
  
 
  Item ID: 301684 
 Version: 15.00 Build: 440528
Version: 14.00 Build: 435445