Runtime stops to work unexpectedly when copy/pasting items in the PFS

Runtime stops to work unexpectedly when copy/pasting items in the PFS

Summary

In the Production and Facility Scheduler you may use copa/paste to duplicate items, e.g. schedules. When doing this on a client it may happen in rare casas that the Runtime stops working.

Description

In the Production and Facility Scheduler you may use copa/paste to duplicate items, e.g. schedules. When doing this on a client it may happen in rare casas that the Runtime stops working.

Solution

the described issue has been resolved. Copy/paste operations can now be performed without any side effects.

Information




Issue Number: 34862
Fixed on Date: 22.7.2015
Versions: 7.11 0 BUILD 21458 | 7.20 0 BUILD 21629
    • Related Articles

    • Runtime stops working unexpectedly when deleting items from the PFS

      Summary In the PFS (Production and Facility Scheduler) you may maintain schedules and time models. You may also delete schedules and time models which are not needed any longer. However, when doing this on a client PC the runtime may stop working in ...
    • Under specific circumstances the zenon Logic runtime stops unexpectedly.

      Summary The zenon Logic FTP function block causes the zenon Logic runtime to suddenly close when the ENABLE input is set to TRUE. Description The zenon Logic FTP function block causes the zenon Logic runtime to suddenly close when the ENABLE input is ...
    • unexpected shutdown of Runtime when expanding the PFS tree

      Summary When using the PFS (Production and Facility Scheduler) it may happen in rare cases that the runtime stops working unexpectedy when expanding the PFS tree on a client. Description When using the PFS (Production and Facility Scheduler) it may ...
    • Runtime Stops working unexpectedly when removing a variable from a schedule

      Summary In the PFS (Production and Facility Scheduler) you may remove a variablesfrom a schedule with the help of the schedule-properties dialog. However, when doing so, the runtime may sop working unexpectedly. Description In the PFS (Production and ...
    • Checklist: Smart Client does not work

      Time estimate: 20 minutes Please go through all the points in the following checklist. If necessary, confirm with IT Department any information you cannot verify before contacting your local COPA-DATA Representative. Checklist usage: #. [Quick hints] ...