Occasionally, it is not possible to import a S7 project in the zenon 7.10 editor.
Summary
In the Import S7 project wizard it might happen that the step Select variables does not display any columns to show and select variables to be imported in the editor.
Description
In the Import S7 project wizard it might happen that the step Select variables does not display any columns to show and select variables to be imported in the editor.
Solution
It has been addressed an issue in the zenon 7.10 editor so that Import S7 project wizard always displays columns to select and import variables correctly.
As a workaround, in the wizard Select variables step it is possible to add the columns manually by right-clicking over the grey top header and choosing the option Column selection... S7 project variables can be successfully imported afterwards.
Issue Number: 31286
Fixed on Date: 10.2.2014
Versions: 7.10 0 BUILD 11355
Related Articles
zenon Changesets Excel
Here, you can access a comprehensive list of changes across all maintained versions of the zenon Software Platform as Excel Worksheets. This includes both implemented bug-fixes and new features. Additionally, these lists are available in CSV format ...
zenon Changesets CSV
Here, you can access a comprehensive list of changes across all maintained versions of the zenon Software Platform as Excel Worksheets. This includes both implemented bug-fixes and new features. Additionally, these lists are available in as Excel ...
FAQ: How to import external vector graphic files in zenon?
Import of vector graphics (DXF and PLT files) is not available for the 64-bit Engineering Studio, so that this can only be done in 32-Bit Engineering Studio. To start 32-Bit Engineering Studio, in the zenon Startup Tool right-click on the respective ...
zenon logic: 1 gain FB with LD can't assign a structure to a structure
Description In zenon Logic it was not possible to add a structure to a structure in LD. However, this is possible in ST and FDB. As a workaround, you can activate the "LD optimizations" option in the project settings in LD. This behavior has been ...
Checklist: Workspace/Project cannot be created, loaded or backed up
Time estimate: 30 minutes Please go through all the points in the following checklist. If necessary, confirm with IT Department any information you cannot verify before contacting your local COPA-DATA Representative. Checklist usage: #. [Quick hints] ...