Metering Point Administration may be used while the runtime server is offline
Summary
In a network project all clients may use the Metering Point Administration without limitations. Data generated through user inputs in the tool is stored in zenon and in the SQL database. In case the runtime server is offline, a client would still allow to use the Metering Point Adminstration but only update information in the SQL database. This leads to inconsistant data stored in zenon and in the database.
Description
In a network project all clients may use the Metering Point Administration without limitations. Data generated through user inputs in the tool is stored in zenon and in the SQL database. In case the runtime server is offline, a client would still allow to use the Metering Point Adminstration but only update information in the SQL database. This leads to inconsistant data stored in zenon and in the database.
Solution
A mechanism has been implemented to verify that the runtime server is online when working with the metering point administration tool. Once the server is offline, the tool is locked. With this it it not possible to generate inconsistant data.
Information
Issue Number: 34438
Fixed on Date: 26.8.2015
Versions: 7.50 0 BUILD 25796
Related Articles
Multiuser projects are excluded from the Metering Point Administration. However, the the Metering Point Administration may still modify the project´s IMM database configuration.
Summary when starting the metering point administration with a multi-user project in the workspace, the wizard correctly identifies the multi-user project and informs that this project will not be available. However, during the check of the IMM ...
Metering Point Administration does not work with variables with Special characters in their names
Summary The Metering Point Administration creates some zenon logic code to calculate the relative values. However, if either the absolute value variable or the relative value variable has special characters (like ä, ü, etc.) in its name, then the ...
Metering Point Administration Wizard may not start when no project is loaded
Summary If no project is added to the open workspace, or no workspace is loaded while starting the Metering Point Administration Wizard, it may happen that the wizard does not work. Description If no project is added to the open workspace, or no ...
Checklist: Multimonitor administration
Time estimate: 15 minutes Please go through all the points in the following checklist. If necessary, confirm with IT Department any information you cannot verify before contacting your local COPA-DATA Representative. zenon configuration file ...
Under specific circumstances the Metering Point Administration ActiveX Control is not visible in the webclient.
Summary It may occur that the Metering Point Administration ActiveX Control is not installed and registered by the webclient setup so that it is not shown in the webclient. Description It may occur that the Metering Point Administration ActiveX ...