It was possible that loadflow calculation succeeded, but results were not distributed on some load paths with inactive branches, or from transformers connected directly to lines with impedance.
Now all load paths will get valid load flow results.
It was possible that loadflow calculation succeeded, but results were not distributed on some load paths with inactive branches, or from transformers connected directly to lines with impedance.
Now all load paths will get valid load flow results.
no workaround