From time to time, at 000ms, zenon Process Gateway sends values with incorrect timestamp.
Summary
From time to time and only when variable timestamp has 000ms, the zenon Process Gateway (e.g. IEC870 Slave) sends incorrect timestamps with 1 second back in time.
Description
From time to time and only when variable timestamp has 000ms, the zenon Process Gateway (e.g. IEC870 Slave) sends incorrect timestamps with 1 second back in time.
Solution
Issue was addressed in gateways: AccessIEC870Sl, AccessAzure and AccessDNP3.
Information
Issue Number: 33631
Fixed on Date: 27.2.2015
Versions: 7.11 0 BUILD 18023
Related Articles
zenon Changesets Excel
Here, you can access a comprehensive list of changes across all maintained versions of the zenon Software Platform as Excel Worksheets. This includes both implemented bug-fixes and new features. Additionally, these lists are available in CSV format ...
zenon Changesets CSV
Here, you can access a comprehensive list of changes across all maintained versions of the zenon Software Platform as Excel Worksheets. This includes both implemented bug-fixes and new features. Additionally, these lists are available in as Excel ...
Checklist: Process Gateway cannot establish a reliable communication
Time estimate: 45 minutes Please go through all the points in the following checklist. If necessary, confirm with IT Department any information you cannot verify before contacting your local COPA-DATA Representative. Checklist usage: #. [Quick hints] ...
Checklist: Process Gateway cannot start
Time estimate: 30 minutes Please go through all the points in the following checklist. If necessary, confirm with IT Department any information you cannot verify before contacting your local COPA-DATA Representative. Checklist usage: #. [Quick hints] ...
Historian: At reload an old value is written again / received values with old external timestamp not discarded
Description In the Service Engine, data from already closed archives is written to the current, open archive capsule in the Historian. This problem can occur: By project reload. If the PLC sends variable values with an external timestamp from the ...