Extended Trend: In RT, it is not possible to add an additional curve

Extended Trend: In RT, it is not possible to add an additional curve

Summary

It is possible to add a curve in the runtime for the extended trend and change the data source under specific circumstances.

Description

It is possible to add a curve in the runtime for the extended trend and change the data source under specific circumstances.

Solution

An issue was addressed in the runtime where it was possible under specific circumstances to change the data source for curves in the extended trend. Now this is no longer possible.

Issue Number: 29232
Fixed on Date: 5.4.2013
Versions: 7.00 0 BUILD 10