ETM: When you display the last open& finished lots and you start, stop AND restart a lot again, the restarted lot is not considered any more (searching for new archives is deactivated then)
Summary
For lot filter there's an option available to display the last X lots. If this filter was active for a screen, the screen was already opened and during the open screen new lots were created it was happening, that the newly created lots were not displayed. There was a bug that if there was no new lot data available for some time it sopped searching for new data. But for this option it never should stop searching for new data. This is not fixed.
Description
For lot filter there's an option available to display the last X lots. If this filter was active for a screen, the screen was already opened and during the open screen new lots were created it was happening, that the newly created lots were not displayed. There was a bug that if there was no new lot data available for some time it sopped searching for new data. But for this option it never should stop searching for new data. This is not fixed.
Issue Number: 137306
Fixed on Date: 29.5.2018
Versions: 7.60 0 BUILD 49005 | 8.00 0 BUILD 48821
Related Articles
Lot filter - last lot returns first lot with cyclic archives
Description The lot filter shows the first lot when "Last lots" is set. This happened due to incorrect sorting of the lots. This error has been fixed. The lots are now sorted again from the most recent to the oldest. So the last lot is used again for ...
Start / Stop / Restart mechanism for integrated Process Gateways
Summary Process Gateways configured in Engineering Studio can now be started, stopped, or forced to be restarted via the new Process gateway action function. Item ID: 256388 Version: 12.00 Build: 153415
Checklist: Engineering Studio cannot start or closes unexpectedly
Time estimate: 30 minutes Please go through all the points in the following checklist. If necessary, confirm with IT Department any information you cannot verify before contacting your local COPA-DATA Representative. Checklist usage: #. [Quick hints] ...
Checklist: VSTA IDE cannot open in zenon
Time estimate: 15 minutes Please go through all the points in the following checklist. If necessary, confirm with IT Department any information you cannot verify before contacting your local COPA-DATA Representative. Following entries must be set in ...
Checklist: Process Gateway cannot start
Time estimate: 30 minutes Please go through all the points in the following checklist. If necessary, confirm with IT Department any information you cannot verify before contacting your local COPA-DATA Representative. Checklist usage: #. [Quick hints] ...