Engineering Studio was sporadically closed after PGW configuration when the logging thread of the DNP3_SG
Process Gateway kept running after the gateway's main instance was deleted.
The issue has been addressed and the behavior is now as expected.
To benefit from this fix:
- Update your zenon Software Platform to the latest build of zenon 14 or higher.