Time estimate: 30 minutes Please go through all the points in the following checklist. If necessary, confirm with IT Department any information you cannot verify before contacting your local COPA-DATA Representative. Checklist usage: #. [Quick hints] ...
Summary Converting to multiuser project after restoring a project backup sometimes fails due to duplicate client IDs in database. Description Converting to multiuser project after restoring a project backup sometimes fails due to duplicate client IDs ...
Summary The editor should not close and reload the workspace currently opened if a user selects it from the last used workspace list. Instead the editor should recognize that the workspace selected is the same and abort the operation. DescriptionThe ...
Summary The editor may close unexpectedly when deleting from the workspace an integration project containing sub-projects and all the projects have been backed up. DescriptionThe editor may close unexpectedly when deleting from the workspace an ...
Summary If no project is added to the open workspace, or no workspace is loaded while starting the Metering Point Administration Wizard, it may happen that the wizard does not work. Description If no project is added to the open workspace, or no ...