datatype structure of structures: by update in datatype the E.Studio is blocked because it forces SQL Server to execute updates on all ProcessVariable items
Summary
Updating structure data types may block the Engineering Studio for a long period of time. This has been improved.
Description
If structure data types are changed, this can lead to
a long blockade of the Engineering Studio. Even if only a few elements have
been changed, the Engineering Studio forces the SQL server to update all
elements of the complex variables. For example, by change affecting only a few elements,
thousands of elements are processed.
This behavior has been changed. The processing now
takes place only on affected elements and typically causes hardly noticeable delay.
To benefit from this fix:
- Update your zenon Software Platform to the latest build of zenon 11 or
higher.
Tip: When the driver uses "Name based" addressing, choose for variable addressing option "Offset calculation" the "Manual addressing" instead of default "Automatic addressing". This generally
reduces the time needed for updates.
Item ID: 263514
Version: 11.00 Build: 157700
Related Articles
FAQ: What SQL server interfaces are offered by zenon?
The most common ones are: The zenon Historian The Extended Trend The zenon Report Generator The zenon Report Engine The zenon SQL export functions The zenon SQL Driver and The zenon Process Gateway SQL module All these modules depend on an ODBC / ...
Checklist: Distributed Engineering – Engineering Studio cannot connect to the Project Database-Server / Elements cannot be checked-in/out
Time estimate: 45 minutes Please go through all the items in the following checklist. If necessary, confirm any information you cannot verify with the IT department before contacting your local COPA-DATA representative. Checklist usage: #. [Quick ...
zenon logic: 1 gain FB with LD can't assign a structure to a structure
Description In zenon Logic it was not possible to add a structure to a structure in LD. However, this is possible in ST and FDB. As a workaround, you can activate the "LD optimizations" option in the project settings in LD. This behavior has been ...
Checklist: Update CE fails
Time estimate: 15 minutes Please go through all the points in the following checklist. If necessary, confirm with IT Department any information you cannot verify before contacting your local COPA-DATA Representative. Screenshot and followed ...
Checklist: OPCDA Server
Time estimate: 20 minutes Please go through all the points in the following checklist. If necessary, confirm with IT Department any information you cannot verify before contacting your local COPA-DATA Representative. Do NOT use DCOM in combination ...