clicking a switch element in the WVS causes a warning in the log with valid configuration
Summary
Warnings are erroneously issued in WVS. This behavior has been changed.
Description
In WVS, a warning is written to the LOG
file when a switch or a button configured as a switch is clicked. The warning
says: "Element with id [number] did not process command of type
primary_pointer_down_command". However, there is no misconfiguration. The
warning is not necessary. The same behavior also occurs with the Combined Element.
The configuration check has been changed.
There is no warning for correct configuration anymore.
To benefit from this fix:
- Update your zenon Software Platform to the
latest build of zenon 11 or later.
Item ID: 254171
Version: 11.00 Build: 106404
Related Articles
Button as switch shows invalid state before a variable value is available
Summary A button element configured as a switch displays an invalid state in the Service Engine before a variable value is available. This behavior has been modified. Description When a screen is opened in the Service Engine, a button element that is ...
Redundant License Configuration
Starting from zenon version 8.00 it is possible to share each license over the CodeMeter network. This allows you to have a dedicated license server. The license server can be any PC or virtual machine which runs CodeMeter. One license for two ...
Under specific circumstances the switch element does not respond to the mouse clicking in the runtime.
Summary The switch element may stop reacting in the runtime when the momentary switch option is activated. DescriptionThe switch element may stop reacting in the runtime when the momentary switch option is activated. Solution The issue was resolved. ...
WVS: Screen elements support interlocking
Summary In WVS screen elements support interlocking. Description The Interlocking of all screen elements is now supported, including Visibility. Substitution with linking rules of symbols or via the Screen switch function is also taken into account. ...
Checklist: ActiveX control element
Time estimate: 30 minutes Please go through all the points in the following checklist. If necessary, confirm with IT Department any information you cannot verify before contacting your local COPA-DATA Representative. Screenshot and followed ...