Batch control related texts "Input interlocking checked successfully" is not translatable via language change feature

Batch control related texts "Input interlocking checked successfully" is not translatable via language change feature

Description

The Batch control related texts were not translatable via the language change feature. 
The issue has been addressed and new CEL Entries and the reaction names in the zenon Engineering Studio can be translated now via the language change feature. 

To benefit from this fix: 
  • Update your zenon Software Platform to the latest build of zenon 11 or higher. 



Item ID: 297335
Version: 12.00 Build: 386318
    • Related Articles

    • Soem texts in the Batch Control module cannot be translated

      Summary In the Batch Control module there are some dialogs with pre-defined texts which cannot be translated. They will always be dispalyed in the language, in which zenon has been started. These dialogs are the edit phase dialog, the confirmation ...
    • The description of the control strategy of a phase in the Batch Control module in the runtime is not translated via Language Change.

      Summary When a keyword is used for Language Change for the description of a Control Strategy of a Phase in the Batch Control module, this description is not translated in the Runtime via the Language Change function. Instead the keyword is shown. ...
    • zenon Changesets Excel

      Here, you can access a comprehensive list of changes across all maintained versions of the zenon Software Platform as Excel Worksheets. This includes both implemented bug-fixes and new features. Additionally, these lists are available in CSV format ...
    • FAQ: Can I translate or change the system texts in the zenon Service Engine?

      Yes, it is possible. All system texts in the Service Engine are keywords for the language change functionality, like user defined texts in projects that start with a "@" character. Using the function "Language switch" and the keywords with ...
    • Checklist: Message Control

      Time estimate: 15 minutes Please go through all the points in the following checklist. If necessary, confirm with IT Department any information you cannot verify before contacting your local COPA-DATA Representative. Screenshot and followed ...