after project conversion -> world view comes to the foreground when running "screen move center" function

after project conversion -> world view comes to the foreground when running "screen move center" function

Description

After a project conversion, when the function "Screen: Move center" is called, the screen of the type Worldview is brought to the foreground. This covers the navigation screen, which can no longer be operated. 

This behavior has been fixed.

To benefit from this fix:

  • Update your zenon Software Platform to the latest build of zenon 8.20 or higher.


Item ID: 257994
Version: 11.00 Build: 111398
Version: 10.00 Build: 112170
Version: 8.20 Build: 111994
    • Related Articles

    • In WVS Screen Move center function doesn’t behave as Service Engine (Desktop)

      Description The "Screen: Move center" function opened a Wordview Screen and moved to the indicated station position in the Service Engine, but not in the WVS. The issue has been addressed and the WVS behavior is now the same as in the Service Engine. ...
    • Incorrect display of combo boxes in world view, when using zoom levels

      Summary Combobox and combolist elements now get better resized with world view zoom. Some specific elements (win32 control based) now have correct size and position in world view. Description Combobox and combolist elements now get better resized ...
    • zenon Changesets Excel

      Here, you can access a comprehensive list of changes across all maintained versions of the zenon Software Platform as Excel Worksheets. This includes both implemented bug-fixes and new features. Additionally, these lists are available in CSV format ...
    • Loss of function call links during a Z10 to Z11 project conversion.

      Description When converting a project from version 10 to version 11, linked function calls are lost. The links are present with the buttons. However, they cannot be executed. This error has been fixed. Links to function calls work as expected after ...
    • Checklist: Workspace/Project cannot be created, loaded or backed up

      Time estimate: 30 minutes Please go through all the points in the following checklist. If necessary, confirm with IT Department any information you cannot verify before contacting your local COPA-DATA Representative. Checklist usage: #. [Quick hints] ...