After a project conversion to zenon 7.60 the properties “Momentary switch“ and “Momentary switch On“ are lost if they were configured at a transparent button element.

After a project conversion to zenon 7.60 the properties “Momentary switch“ and “Momentary switch On“ are lost if they were configured at a transparent button element.

Summary

The properties “Momentary switch“ and “Momentary switch On“ configured for a transparent button are lost after a project conversion to zenon 7.60.

Description

The properties “Momentary switch“ and “Momentary switch On“ configured for a transparent button are lost after a project conversion to zenon 7.60.

Solution

The issue has been addressed and the button will not lose its switch properties anymore.

Issue Number: 38926
Fixed on Date: 20.9.2017
Versions: 7.60 0 BUILD 41721
    • Related Articles

    • Button as switch shows invalid state before a variable value is available

      Summary A button element configured as a switch displays an invalid state in the Service Engine before a variable value is available. This behavior has been modified. Description When a screen is opened in the Service Engine, a button element that is ...
    • On Windows 8 and Windows 10 Multi-Touch issue related to configured button as Momentary switch.   

      Summary A button was configured as a Momentary switch with default status On. The operator touches the button with one finger and with a second finger touch on a blank location on the same screen. The operator lifted the finger from the button and ...
    • zenon Changesets CSV

      Here, you can access a comprehensive list of changes across all maintained versions of the zenon Software Platform as Excel Worksheets. This includes both implemented bug-fixes and new features. Additionally, these lists are available in as Excel ...
    • zenon Changesets Excel

      Here, you can access a comprehensive list of changes across all maintained versions of the zenon Software Platform as Excel Worksheets. This includes both implemented bug-fixes and new features. Additionally, these lists are available in CSV format ...
    • Checklist: VSTA IDE: "Error: Unable to create macro projects. Is the correct project template installed?"

      Time estimate:   15 minutes Please go through all the points in the following checklist. If necessary, confirm with IT Department any information you cannot verify before contacting your local COPA-DATA Representative. For yet unknown reason the path ...