Zenon 7.60 Scheduler problem changing switching time in Runtime

Zenon 7.60 Scheduler problem changing switching time in Runtime

Hello everyone,

I'm experiencing a problem with the Scheduler in Zenon 7.60 Runtime.

I can create a schedule, but once the switching times of the switching points are set, they can't be changed. Double click switching point, change the switching time and press OK, nothing changes in the schedule. Saving the changes also does nothing.

I have to remove the switching time and create a new switching time. In earlier versions of Zenon, I did not have this issue.

Do I need to change a setting in the Editor? Am I doing something else wrong?

Hoping for a quick response,

Best regards,

Jacob




This is a migrated post! Originally posted on 02.02.2018 by user bortdegraaf. Please be aware that information can be outdated.