Scheduler problem

Scheduler problem

Hi, Trying to use Scheduler to run compressor station at my customer site. Unfortunately struggling to set it up, i have created Scheduler Group, Disabled the updating from editor to RT, created RT Scheduler Screen. I am able to create switching points both in editor and RT but when the trigger time passes there is no any manipulation on this variable that have been set for this specific switching point. Further questions: 1. Does 1 Scheduler Group can manipulate different variables or 1 Scheduler for 1 variable? 2. If only 1 variable can be manipulated how can i set multiple time zones? Thanks in advance.

This is a migrated post! Originally posted on 15.11.2021 by user nahoqu. Please be aware that information can be outdated.