Role of Execute Repair in IMM
Hello Team,
I have made a demo project and add IMM(Industrial Maintenance Manager) in it.
I have used zenon internal variable as a switching counter variable.
Sequence for operation performance:
1) Configure device.
2) In maintenance of device assign switching counter value as 50{for warning} and 60{for execution}.
3) On count 50 in maintenance it shows "warning exceeds maintenance in 10 switching cycles".
4) After pressing Execute maintenance, we will get next maintenance warning when count reaches to 100.
5) Done 4 successive cycles of maintenance.
6) After successive maintenance, if we press Execute repair then it shows popup as "Should the counter be reset". By clicking on YES maintenance takes place.(now count is 250)
7) As per my understanding from reading Help file that, counter should get reset means after entering 50 value in switching counter it should give maintenance warning but actually it gives next warning on 300th switching counter.
Can you please tell me exact difference between Execute Repair and Execute Maintenance?
I have checked this things in Version 7.60 Build52066 and 8.00 Build 53129.
Regards,
Rahul.
This is a migrated post! Originally posted on 24.07.2019 by user rahulindore05. Please be aware that information can be outdated.