Is it possible, in PFS, to use a calculated value (math var) as the offset for a schedule, type Time Relative? If so, how?
Example:
Controlling a heater, the heater must be switched on a calculated time before shift starts. The pre-start time depends on outside temperature.
This is a migrated post! Originally posted on 08.01.2010 by user hansvanzijp. Please be aware that information can be outdated.