modify Scheduler with VBA

modify Scheduler with VBA

Sorry Mark one more question please!
Let me describe the steps that i have done.
1- I created the variable that i will use in the scheduler(Editor).
2- Then i created the switching point in the scheduler (Runtime).
3- Now what i want to do is to change the switch point (e.g. change the execution hour) in the scheduler without "touching" the scheduler element. I would like to do this with a VBA Script.
ItÂ's possible? Could you tell me some more information please.
Thanks one more time. :)

This is a migrated post! Originally posted on 01.04.2008 by user rloureiro. Please be aware that information can be outdated.