IEC 101 - End of Initialization
Dear Supporter,
I could not connect zenon IEC101 Process Gateway to Test Harness (ver. 3.7.0.0) successfully. According to attached log files, the connection does not established correctly because Zenon does not reset the Remote Link at the start up and also does not send M_IE_NA_1 message (end of initialization). It seems only Link layer message (Request & Response) are available on communication channel.
According to the Process Gateway.pdf file (Process initialized section-page 39), it is possible to define T70 command to cause the Process Gateway sends the end of initialization message and remote reset command.
Which type of variable should be assign to T70 identification type? In my test project, there is no selectable variable for that. You can see attached screen. Could you please clarify this step for us (How & where create an IO of type M_EI_NA_1 (T70) with IOA0)?
Also, if I send GI command manually by Test Harness, the connection will be established successfully.
My Zenon is 6.51 SP0.
Thanks,
This is a migrated post! Originally posted on 02.07.2015 by user michael_k. Please be aware that information can be outdated.