CEL, replace value.

CEL, replace value.

Hi!

I wonder is it possible to catch the value which is going to be written into CEL, modify it and then write into CEL?

I know that I can write my own info into CEL by ObjectModel. But I want to get rid of automatically generated info about RGMRecipe changes and do it on my own.
I think that it is possible to turn off automatic CEL info generating. It is my plan B to do it this way, but changing automatic CEL values would be better for my project.





This is a migrated post! Originally posted on 04.12.2018 by user www121212. Please be aware that information can be outdated.

    Disclaimer

    This document governs the use of our Community Forum. By registering and using the platform, you accept these conditions.

    The COPA-DATA Community Forum serves to encourage the exchange of information and experience about the zenon software between forum users respectively zenon users.

    Please mind that any published information on the Community Forum is the subjective opinion and view based on the experience and the level of knowledge of the author. COPA-DATA does not overtake any responsibility for the content and the accuracy of the shared information.

    Users of the Community Forum are encouraged to share only well-founded experiences and to point out any risks associated with the implementation of proposed solutions to problems. COPA-DATA at its absolute discretion, reserves the right to moderate the forum. In this connection COPA-DATA may remove any information containing false facts, potentially dangerous solutions, bad language or content that may insult, degrade or discriminate others. COPA-DATA may block a non-complying user from forum access if the user violated this provision.

    COPA-DATA reserves the right to change this document from time to time at own discretion.


    Ing. Punzenberger COPA-DATA GmbH
    Karolingerstraße 7b · 5020 Salzburg · Austria
    www.copadata.com